AMERICAN ENERGY ATLAS
Power·California

Oxnard Wastewater Treatment Plant

Ventura County, California · CAISO · operated by Oxnard City of

2023 · headline year
Capacity in service1.5MW3 units · biomass
Net generation5.83GWh2023 · reported
Rank in California#1,351 (tied)of 1,713 · by capacity · #11,232 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor44%2023

Location

Ventura County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

86% Landfill gas · 87,492 MMBtu · reported14% Natural gas · 13,778 MMBtu · reported

Landfill gas supplies 86% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 1.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 76100.5BiogasOther Waste Biomass1981Operating
Unit 77100.5BiogasOther Waste Biomass1981Operating
Unit 78100.5BiogasOther Waste Biomass1981Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Oxnard City of
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
50224

Common questions

How big is Oxnard Wastewater Treatment Plant?
1.5 MW across 3 generating units in service.
Who owns and operates it?
Operated by Oxnard City of, filed as municipally owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. Every operating unit came online in 1981.
When is it due to retire?
No retirement date has been filed for any operating unit at Oxnard Wastewater Treatment Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.

Related pages

California energyAll facilities in the state→One Market Plaza1.5 MW operating capacity→ Otoe Solar Power Generation Station 1 LL1.5 MW operating capacity→ Park Meridian #11.5 MW operating capacity→ POM Juice Solar1.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming