Ventura County, California · CAISO · operated by Oxnard City of
Landfill gas supplies 86% of the fuel energy it burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 7610 | 0.5 | Biogas | Other Waste Biomass | 1981 | Operating |
| Unit 7710 | 0.5 | Biogas | Other Waste Biomass | 1981 | Operating |
| Unit 7810 | 0.5 | Biogas | Other Waste Biomass | 1981 | Operating |
All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →