Rapides Parish, Louisiana · MISO · operated by Rye Development
Capacity shown is planned or not in service
A planned 48.6 MW conventional hydroelectric project, filed to come online in 2028.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit NA1 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit NA2 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit NA3 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit NA4 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit NA5 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit NA6 | 8.1 | Water | Conventional Hydroelectric | 2028 | Proposed |
All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit NA1 | new unit | 2028 | 8.1 MW |
| Unit NA2 | new unit | 2028 | 8.1 MW |
| Unit NA3 | new unit | 2028 | 8.1 MW |
| Unit NA4 | new unit | 2028 | 8.1 MW |
| Unit NA5 | new unit | 2028 | 8.1 MW |
| Unit NA6 | new unit | 2028 | 8.1 MW |