Power·Washington
Ostrea Solar, LLC
Yakima County, Washington · BPAT · operated by Cypress Creek Renewables
Capacity shown is planned or not in service
Proposed
A planned 80.0 MW solar photovoltaic project, filed to come online in 2026.
Planned capacity80.0MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Cypress Creek Renewables
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- BPAT
- NERC region
- WECC
- EIA plant ID
- 66384
Common questions
How big is Ostrea Solar, LLC?
80.0 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Cypress Creek Renewables, filed as independent power producer.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (80.0 MW).
Related pages
Select a state