Fuel spend$18,2652023 · estimate
Capacity in service2.4MW2 units · wind + solar · 4 more on standby or out of service
Rank in Iowa#205of 256 · by capacity · #9,489 (tied) of 13,147 US
Reported suppliersNot reported2023
All 6 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; panel technology, tracking and DC capacity.
See the engineering record →
How big is Osage (IA)?
2.4 MW across 2 generating units in service — 1.6 MW of wind and 0.8 MW of solar. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Osage - (IA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. The oldest operating unit is Unit W1 (2009); the newest is Unit SO (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at Osage (IA). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $18,265 in 2023 — natural gas $11,594 and oil & petroleum $6,671. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.