CO₂ emitted327,235t2023 · reported to EPA · 1,176th highest of 6,030 in the US
Rank in Arizona#12of 166 · by capacity · #403 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor9%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 6.26 TBtu · reported
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
12 of 12 shown · 806 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GT3
140.0
Natural Gas
Natural Gas Fired Combustion Turbine
2019
Operating
Unit GT4
140.0
Natural Gas
Natural Gas Fired Combustion Turbine
2019
Operating
Unit GT5
140.0
Natural Gas
Natural Gas Fired Combustion Turbine
2019
Operating
Unit GT6
140.0
Natural Gas
Natural Gas Fired Combustion Turbine
2019
Operating
Unit GT7
140.0
Natural Gas
Natural Gas Fired Combustion Turbine
2019
Operating
Unit GT1
53.1
Natural Gas
Natural Gas Fired Combustion Turbine
1972
Operating
Unit GT2
53.1
Natural Gas
Natural Gas Fired Combustion Turbine
1973
Operating
Unit 1
113.6
Natural Gas
Natural Gas Steam Turbine
1960
Retired 2019
Unit 2
113.6
Natural Gas
Natural Gas Steam Turbine
1960
Retired 2019
Unit PVM
0.4
Solar
Solar Photovoltaic
1988
Retired 2015
Unit PV1
0.1
Solar
Solar Photovoltaic
1998
Retired 2015
Unit PV2
0.1
Solar
Solar Photovoltaic
1999
Retired 2015
All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
806 MW across 7 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Pinnacle West Capital Corp (100%) and operated by Arizona Public Service Co, filed as investor-owned utility.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. The oldest operating unit is Unit GT1 (1972); the newest are Unit GT3, Unit GT4, Unit GT5, Unit GT6 and 1 more (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at Ocotillo Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $28.5M in 2023.
How much CO₂ does it emit?
327,235 t in 2023, reported to the EPA — the 1,176th highest of 6,030 US facilities that reported. Up from 65,750 t in 2011.