AMERICAN ENERGY ATLAS
Industrial + power·Michigan

Northern Oaks Recycling and Disposal

Harrison, Clare County, Michigan · MISO · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$189,1672023 · estimate
Capacity in service1.6MW1 unit · biomass
Net generation7.97GWh2023 · reported
CO₂ emitted34,529t2023 · reported to EPA · 4,444th highest of 6,030 in the US
Rank in Michigan#233 (tied)of 258 · by capacity · #11,073 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor57%2023

Location

Clare County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 86,822 MMBtu · reported

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 1.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN11.6Landfill gasLandfill Gas2010Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007729
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
57024

Common questions

How big is Northern Oaks Recycling and Disposal?
1.6 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at Northern Oaks Recycling and Disposal. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $189,167 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
34,529 t in 2023, reported to the EPA — the 4,444th highest of 6,030 US facilities that reported. Down from 54,159 t in 2011.

Related pages

Michigan energyAll facilities in the state→Way Dam1.8 MW operating capacity→ Venice Park RDF1.6 MW operating capacity→ Cascade Dam (MI)1.6 MW operating capacity→ French Landing Dam1.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming