North Loop

Pima County, Arizona · TEPC · operated by Tucson Electric Power Co

2023 · headline year
Fuel spend$335,7872023 · estimate
Capacity in service108MW4 units · gas
Net generation3.65GWh2023 · reported
Rank in Arizona#52of 166 · by capacity · #2,257 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor0%2023

Location

Pima County · TEPC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 78,969 MMBtu · reported · $324,835 est.1% Oil & petroleum · 444 MMBtu · reported · $10,952 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 108 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 127.0Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit 227.0Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit 327.0Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit 426.8Natural GasNatural Gas Fired Combustion Turbine2001Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Tucson Electric Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
TEPC
NERC region
WECC
Gas pipeline
Southwest Gas Corporation
EIA plant ID
6088

Common questions

How big is North Loop?
108 MW across 4 generating units in service.
Who owns and operates it?
Operated by Tucson Electric Power Co, filed as investor-owned utility.
Which grid does it sell into?
TEPC (Tucson Electric Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1979. The oldest operating units are Unit 1, Unit 2 and Unit 3 (1972); the newest is Unit 4 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at North Loop. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $335,787 in 2023 — natural gas $324,835 and oil & petroleum $10,952. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Arizona energyAll facilities in the state→Black Mountain Generating Station121 MW operating capacity→ Mesquite Solar 5, LLC120 MW operating capacity→ Central Line Solar, LLC100 MW operating capacity→ East Line Solar100 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming