AMERICAN ENERGY ATLAS
Power·Iowa

North Generation Plant

Adair County, Iowa · MISO · operated by City of Greenfield - (IA)

2023 · headline year
Fuel spend$9,7502023 · estimate
Capacity in service8.0MW4 units · oil
Net generation45MWh2023 · reported
Rank in Iowa#149 (tied)of 256 · by capacity · #5,917 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Adair County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 456 MMBtu · reported · $9,750 est.

Reported fuel consumption, MMBtu · 2011–2023

01,0002,0003,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 8.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 32.2Distillate oilPetroleum Liquids2011Operating
Unit 42.2Distillate oilPetroleum Liquids2011Operating
Unit 11.8Distillate oilPetroleum Liquids2002Operating
Unit 21.8Distillate oilPetroleum Liquids2002Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Greenfield - (IA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
7856

Common questions

How big is North Generation Plant?
8.0 MW across 4 generating units in service.
Who owns and operates it?
Operated by City of Greenfield - (IA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating units are Unit 1 and Unit 2 (2002); the newest are Unit 3 and Unit 4 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at North Generation Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $9,750 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Iowa energyAll facilities in the state→Grundy Center City Light Plant8.7 MW operating capacity→ Junction Hilltop Wind Farm8.0 MW operating capacity→ Adm Soybean Processing - Des Moines7.9 MW operating capacity→ CED Centerville Wind7.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming