AMERICAN ENERGY ATLAS
Power·New York

NewYork-Presbyterian Brooklyn Methodist

Kings County, New York · NYISO · operated by NewYork-Presbyterian Brooklyn Methodist Hospital

2023 · headline year
Fuel spend$14,8872023 · estimate
Capacity in service2.8MW3 units · oil · 3 more on standby or out of service
Net generation65MWh2023 · reported
Rank in New York#681 (tied)of 1,018 · by capacity · #9,177 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Kings County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

94% Natural gas · 1,291 MMBtu · reported · $13,013 est.6% Oil & petroleum · 81 MMBtu · reported · $1,874 est.

Natural gas supplies 94% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 2.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CCHEG1.5Distillate oilPetroleum Liquids2020Standby
Unit 02-8P1.0Distillate oilPetroleum Liquids2006Operating
Unit 03-8L1.0Distillate oilPetroleum Liquids2008Operating
Unit 01-8N0.8Distillate oilPetroleum Liquids2006Operating
Unit 04-6Z0.8Distillate oilPetroleum Liquids2006Standby
Unit 05-6Z0.8Distillate oilPetroleum Liquids2006Standby
Unit 3A0.9Natural GasNatural Gas Internal Combustion Engine1991Retired 2015
Unit 4C0.9Natural GasNatural Gas Internal Combustion Engine1991Retired 2015

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
NewYork-Presbyterian Brooklyn Methodist Hospital
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
52091

Common questions

How big is NewYork-Presbyterian Brooklyn Methodist?
2.8 MW across 3 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by NewYork-Presbyterian Brooklyn Methodist Hospital, filed as commercial.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating units are Unit 02-8P and Unit 01-8N (2006); the newest is Unit 03-8L (2008).
When is it due to retire?
No retirement date has been filed for any operating unit at NewYork-Presbyterian Brooklyn Methodist. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $14,887 in 2023 — natural gas $13,013 and oil & petroleum $1,874. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

New York energyAll facilities in the state→Warrensburg Hydroelectric2.9 MW operating capacity→ Clemons Road Solar2.8 MW operating capacity→ NY Country Road 67 and Majorana2.8 MW operating capacity→ SCH County - (2D) 98 Cheltingham Ave Sch2.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming