AMERICAN ENERGY ATLAS
Power·Minnesota

New Ulm

Brown County, Minnesota · MISO · operated by New Ulm Public Utilities Comm

2023 · headline year
Fuel spend$1.28M2023 · estimate
Capacity in service72.5MW4 units · oil + gas · 1 more on standby or out of service
Net generation1.26GWh2023 · reported
Rank in Minnesota#55of 767 · by capacity · #3,029 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012

Location

Brown County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 246,638 MMBtu · reported · $1.22M est.1% Oil & petroleum · 2,641 MMBtu · reported · $56,471 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 72.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 727.5Distillate oilPetroleum Liquids2001Operating
Unit 524.0Distillate oilPetroleum Liquids1975Operating
Unit 415.0Natural GasNatural Gas Steam Turbine1965Operating
Unit 36.0Natural GasNatural Gas Steam Turbine1957Out of service
Unit 66.0Natural GasNatural Gas Steam Turbine1997Operating

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 25 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
New Ulm Public Utilities Comm
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Hutchinson Utilities Commission
EIA plant ID
2001

Common questions

How big is New Ulm?
72.5 MW across 4 generating units in service — 51.5 MW of oil and 21.0 MW of natural gas. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by New Ulm Public Utilities Comm, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating unit is Unit 4 (1965); the newest is Unit 7 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at New Ulm. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $1.28M in 2023 — natural gas $1.22M and oil & petroleum $56,471. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Minnesota energyAll facilities in the state→Hibbard Energy Center72.8 MW operating capacity→ Thomson72.6 MW operating capacity→ Marshall Solar Energy Project62.3 MW operating capacity→ St Bonifacius61.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming