AMERICAN ENERGY ATLAS
Power·Connecticut

New Milford Gas Recovery

Litchfield County, Connecticut · ISO-NE · operated by WM Renewable Energy LLC

2023 · headline year
Capacity in service1.6MW2 units · biomass
Net generation5.44GWh2023 · reported
Rank in Connecticut#123 (tied)of 168 · by capacity · #11,073 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor39%2023

Location

Litchfield County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 68,926 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 1.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN20.8Landfill gasLandfill Gas2008Operating
Unit GEN40.8Landfill gasLandfill Gas2008Operating
Unit GEN13.0Landfill gasLandfill Gas1991Retired 2007
Unit GEN30.8Landfill gasLandfill Gas2008Retired 2016

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
50564

Common questions

How big is New Milford Gas Recovery?
1.6 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. Every operating unit came online in 2008.
When is it due to retire?
No retirement date has been filed for any operating unit at New Milford Gas Recovery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Connecticut energyAll facilities in the state→Emerald Gardens PKI, LLC1.6 MW operating capacity→ Goodwin Hydroelectric1.6 MW operating capacity→ North Haven Solar One1.6 MW operating capacity→ Taftville1.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming