AMERICAN ENERGY ATLAS
Power·Iowa

New Hampton

Chickasaw County, Iowa · SPP · operated by City of New Hampton - (IA)

2023 · headline year
Fuel spend$302,5162023 · estimate
Capacity in service10.6MW2 units · oil · 3 more on standby or out of service
Net generation2.4GWh2023 · reported
Rank in Iowa#141of 256 · by capacity · #5,308 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Chickasaw County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

93% Oil & petroleum · 14,006 MMBtu · reported · $299,482 est.7% Natural gas · 1,041 MMBtu · reported · $3,035 est.

Oil & petroleum supplies 93% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 10.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 46.2Natural GasNatural Gas Internal Combustion Engine1973Standby
Unit 56.2Natural GasNatural Gas Internal Combustion Engine1973Standby
Unit 75.3Distillate oilPetroleum Liquids1999Operating
Unit 85.3Distillate oilPetroleum Liquids1999Operating
Unit 33.5Natural GasNatural Gas Internal Combustion Engine1967Standby

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of New Hampton - (IA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
EIA plant ID
1168

Common questions

How big is New Hampton?
10.6 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of New Hampton - (IA), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1999. Every operating unit came online in 1999.
When is it due to retire?
No retirement date has been filed for any operating unit at New Hampton. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $302,516 in 2023 — oil & petroleum $299,482 and natural gas $3,035. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Iowa energyAll facilities in the state→South Plant (IA)12.0 MW operating capacity→ Metro Methane Recovery Facility11.2 MW operating capacity→ Iowa Lakes Superior Wind Farm10.5 MW operating capacity→ Lakota Wind Wind Farm10.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming