AMERICAN ENERGY ATLAS
Power·Nevada

Nevada Solar One

Clark County, Nevada · NEVP · operated by Acciona Solar Power

2023 · headline year
Fuel spend$188,2532023 · estimate
Capacity in service75.7MW1 unit · solar
Rank in Nevada#46of 111 · by capacity · #2,834 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012

Location

Clark County · NEVP · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 26,027 MMBtu · reported · $188,253 est.

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 75.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ONE75.7SolarSolar Thermal without Energy Storage2007Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; panel technology, tracking and DC capacity.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 23 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Acciona Solar Power
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
NEVP
NERC region
WECC
Gas pipeline
Southwest Gas Corporation
EIA plant ID
56405

Common questions

How big is Nevada Solar One?
75.7 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Acciona Solar Power, filed as independent power producer.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007.
When is it due to retire?
No retirement date has been filed for any operating unit at Nevada Solar One. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $188,253 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Nevada energyAll facilities in the state→Copper Mountain Solar 4, LLC93.6 MW operating capacity→ Playa Solar 1, LLC79.0 MW operating capacity→ Tungsten Mountain74.8 MW operating capacity→ Dixie Valley70.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming