AMERICAN ENERGY ATLAS
Power·Utah

Nebo Power Station

Payson, Utah County, Utah · PACE · operated by Utah Associated Mun Power Sys · owned by Uamps

2023 · headline year
Fuel spend$56.2M2023 · estimate
Capacity in service140MW2 units · gas
Net generation825GWh2023 · reported
CO₂ emitted344,442t2023 · reported to EPA · 1,147th highest of 6,030 in the US
Rank in Utah#13of 123 · by capacity · #1,962 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor67%2023

Location

Utah County · PACE · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 7.04 TBtu · reported · $56.2M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 140 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST175.0Natural GasNatural Gas Fired Combined Cycle2004Operating
Unit GT165.0Natural GasNatural Gas Fired Combined Cycle2004Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 48 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Uamps · 100%
Operating utility
Utah Associated Mun Power Sys
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000444
Balancing authority
PACE
NERC region
WECC
Gas pipeline
Questar P L Co
EIA plant ID
56177

Common questions

How big is Nebo Power Station?
140 MW across 2 generating units in service.
Who owns and operates it?
Owned by Uamps (100%) and operated by Utah Associated Mun Power Sys, filed as political subdivision.
Which grid does it sell into?
PACE (PacifiCorp - East) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. Every operating unit came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Nebo Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $56.2M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
344,442 t in 2023, reported to the EPA — the 1,147th highest of 6,030 US facilities that reported. Up from 137,465 t in 2011.

Related pages

Utah energyAll facilities in the state→Appaloosa Solar I200 MW operating capacity→ Flaming Gorge152 MW operating capacity→ Cove Mountain Solar 2122 MW operating capacity→ Milford Wind Corridor Stage II LLC102 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming