AMERICAN ENERGY ATLAS
Power·North Carolina

NCSU CCUP Cogeneration Plant

Wake County, North Carolina · CPLE · operated by NC State University, Energy Systems

2023 · headline year
Fuel spend$4.15M2023 · estimate
Capacity in service6.6MW2 units · gas
Net generation43.7GWh2023 · reported
Rank in North Carolina#175of 908 · by capacity · #6,214 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor76%2023

Location

Wake County · CPLE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 613,103 MMBtu · reported · $3.99M est.1% Oil & petroleum · 6,797 MMBtu · reported · $160,953 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2019–23

0250,000500,000750,000201920212023
Reported (through 2023)

Generating units

2 of 2 shown · 6.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CTG15.6Natural GasNatural Gas Fired Combustion Turbine2019Operating
Unit STG1.0Natural GasNatural Gas Steam Turbine2019Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
NC State University, Energy Systems
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Balancing authority
CPLE
NERC region
SERC
EIA plant ID
61675

Common questions

How big is NCSU CCUP Cogeneration Plant?
6.6 MW across 2 generating units in service.
Who owns and operates it?
Operated by NC State University, Energy Systems, filed as state-owned utility.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. Every operating unit came online in 2019.
When is it due to retire?
No retirement date has been filed for any operating unit at NCSU CCUP Cogeneration Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $4.15M in 2023 — natural gas $3.99M and oil & petroleum $160,953. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

North Carolina energyAll facilities in the state→Asheville-Rock Hill Battery8.8 MW operating capacity→ Ingredion Winston Salem8.4 MW operating capacity→ Floyd Solar, LLC6.5 MW operating capacity→ Innovative Solar 556.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming