AMERICAN ENERGY ATLAS
Power·North Carolina

NCEMC Anson Plant

Lilesville, Anson County, North Carolina · CPLE · operated by North Carolina El Member Corp · owned by North Carolina Electric Membership Corp

2023 · headline year
Fuel spend$9.28M2023 · estimate
Capacity in service344MW6 units · gas
Net generation92.2GWh2023 · reported
CO₂ emitted52,914t2023 · reported to EPA · 3,581st highest of 6,030 in the US
Rank in North Carolina#20 (tied)of 908 · by capacity · #906 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor3%2023

Location

Anson County · CPLE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

97% Natural gas · 1.35 TBtu · reported · $8.31M est.3% Oil & petroleum · 0.0395 TBtu · reported · $968,458 est.

Natural gas supplies 97% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 344 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 157.3Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 257.3Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 357.3Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 457.3Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 557.3Natural GasNatural Gas Fired Combustion Turbine2007Operating
Unit 657.3Natural GasNatural Gas Fired Combustion Turbine2007Operating

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 182 deliveries are on record for 2011–2023.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
North Carolina El Member Corp
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000459
Balancing authority
CPLE
NERC region
SERC
EIA plant ID
56249

Common questions

How big is NCEMC Anson Plant?
344 MW across 6 generating units in service.
Who owns and operates it?
Owned by North Carolina Electric Membership Corp (100%) and operated by North Carolina El Member Corp, filed as cooperative.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. Every operating unit came online in 2007.
When is it due to retire?
No retirement date has been filed for any operating unit at NCEMC Anson Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $9.28M in 2023 — natural gas $8.31M and oil & petroleum $968,458. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
52,914 t in 2023, reported to the EPA — the 3,581st highest of 6,030 US facilities that reported. Down from 125,911 t in 2011.

Related pages

North Carolina energyAll facilities in the state→Kings Mountain Energy Center544 MW operating capacity→ Cowans Ford350 MW operating capacity→ NCEMC Hamlet Plant344 MW operating capacity→ Butler-Warner Generation Plant305 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming