AMERICAN ENERGY ATLAS
Power·Pennsylvania

Navy Yard Peaker Station

Philadelphia County, Pennsylvania · PJM · operated by Philadelphia Authority for Industrial Development

2023 · headline year
Fuel spend$46,8132023 · estimate
Capacity in service8.0MW4 units · gas
Net generation1.18GWh2023 · reported
Rank in Pennsylvania#173 (tied)of 256 · by capacity · #5,917 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor2%2023

Location

Philadelphia County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 15,230 MMBtu · reported · $46,813 est.

Reported fuel consumption, MMBtu · 2017–23

050,000100,000150,000201720202023
Reported (through 2023)

Generating units

4 of 4 shown · 8.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN12.0Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit GEN22.0Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit GEN32.0Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit GEN42.0Natural GasNatural Gas Internal Combustion Engine2018Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Philadelphia Authority for Industrial Development
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
61737

Common questions

How big is Navy Yard Peaker Station?
8.0 MW across 4 generating units in service.
Who owns and operates it?
Operated by Philadelphia Authority for Industrial Development, filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating units are Unit GEN1, Unit GEN2 and Unit GEN3 (2017); the newest is Unit GEN4 (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at Navy Yard Peaker Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $46,813 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Pennsylvania energyAll facilities in the state→Somerset Windpower LLC9.0 MW operating capacity→ Pioneer Crossing Landfill8.0 MW operating capacity→ Falling Spring7.2 MW operating capacity→ East Campus Steam Plant7.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming