Natchez, Adams County, Mississippi · MISO · operated by Entergy Mississippi LLC
last reported to the EPA in 2012
Retired 2011
Retired — its last generating unit went out of service in 2011, ending 66.0 MW of capacity.
Retired capacity66.0MW1 unit · none in service
CO₂ emittedNot reported2023 · last reported 2012
Reported suppliersNot reported2023
Location
CO₂ emitted, t · 2011–12
Reported (through 2012)
Generating units
1 of 1 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
66.0
Natural Gas
Natural Gas Steam Turbine
1951
Retired 2011
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.