AMERICAN ENERGY ATLAS
Power·Illinois

Nalco

DuPage County, Illinois · PJM · operated by Nalco Co

2023 · headline year
Fuel spend$2.21M2023 · estimate
Capacity in service4.0MW1 unit · gas · 1 more on standby or out of service
Net generation16.7GWh2023 · reported
Rank in Illinois#201 (tied)of 433 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

DuPage County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 307,345 MMBtu · reported · $2.21M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit AT14.0Natural GasNatural Gas Fired Combined Cycle1985Operating
Unit DPOX0.7Natural GasNatural Gas Fired Combined Cycle1985Out of service

All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Nalco Co
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50326

Common questions

How big is Nalco?
4.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Nalco Co, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1985.
When is it due to retire?
No retirement date has been filed for any operating unit at Nalco. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.21M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Illinois energyAll facilities in the state→CSL Behring LLC4.2 MW operating capacity→ McDonough Solar 1, LLC CSG4.0 MW operating capacity→ IGS Stockton DG CSG3.8 MW operating capacity→ Galva Landfill3.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming