AMERICAN ENERGY ATLAS
Power·West Virginia

Mountaineer (1301)

New Haven, Mason County, West Virginia · PJM · operated by Appalachian Power Co · owned by American Electric Power Co Inc

2023 · headline year

The 3rd-largest reported CO₂ emitter among facilities in West Virginia — 4.87 Mt in 2023, 100% coal by fuel energy in 2023, first unit online in 1980.

Fuel spend$152M2023 · estimate
Capacity in service1,300MW1 unit · coal
Net generation4.97TWh2023 · reported
CO₂ emitted4.87Mt2023 · reported to EPA · 75th highest of 6,030 in the US
Rank in West Virginia#6of 40 · by capacity · #191 (tied) of 13,147 US
Reported suppliers92023 · 83 deliveries
Capacity factor44%2023

Location

Mason County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Coal · 50.4 TBtu · reported · $147M est.

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 1,300 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 11,300.0Bituminous coalConventional Steam Coal1980Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 9 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Alliance CoalCoal37.41,507,919Tunnel Ridge Mine, West Virginia + 1 moreRiver barge

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 9 suppliers. Subscribe to see all 9, every one of the 1,093 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 9 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
American Electric Power Co Inc · 100%
Operating utility
Appalachian Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001052
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
6264

Common questions

How big is Mountaineer (1301)?
1,300 MW across 1 generating unit in service.
Who owns and operates it?
Owned by American Electric Power Co Inc (100%) and operated by Appalachian Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1980.
When is it due to retire?
No retirement date has been filed for any operating unit at Mountaineer (1301). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 8 coal suppliers, from mines in West Virginia, Kentucky and Pennsylvania — principally Tunnel Ridge Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $152M in 2023 — coal $147M and oil & petroleum $4.62M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
4.87 Mt in 2023, reported to the EPA — the 75th highest of 6,030 US facilities that reported. Down from 8.33 Mt in 2011.

Related pages

West Virginia energyAll facilities in the state→Mitchell (WV)1,633 MW operating capacity→ Pleasants Power Station1,368 MW operating capacity→ Fort Martin Power Station1,152 MW operating capacity→ Longview Power808 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming