AMERICAN ENERGY ATLAS
Power·Louisiana

Mosaic Phosphates Uncle Sam

St James Parish, Louisiana · MISO · operated by Mosaic Phosphates Co.

2023 · headline year
Capacity in service26.0MW2 units · other sources
Rank in Louisiana#64of 86 · by capacity · #4,170 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

St James Parish · MISO · SERC

Generating units

3 of 3 shown · 26.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN315.0Waste heatAll Other2016Operating
Unit GEN211.0Waste heatAll Other1968Operating
Unit GEN111.0OtherAll Other1968Retired 2011

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Mosaic Phosphates Co.
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
10198

Common questions

How big is Mosaic Phosphates Uncle Sam?
26.0 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Mosaic Phosphates Co., filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating unit is Unit GEN2 (1968); the newest is Unit GEN3 (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at Mosaic Phosphates Uncle Sam. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by other.

Related pages

Louisiana energyAll facilities in the state→Lake Charles Polymers31.1 MW operating capacity→ Ivanhoe Generation Facility31.0 MW operating capacity→ Chevron Oronite Oak Point23.5 MW operating capacity→ ADA Carbon Solutions (Red River), LLC20.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming