Missouri River Wastewater Treatment

Douglas County, Nebraska · SPP · operated by City of Omaha

2023 · headline year
Fuel spend$89,9882023 · estimate
Capacity in service3.0MW3 units · biomass
Net generation12.6GWh2023 · reported
Rank in Nebraska#94 (tied)of 127 · by capacity · #8,746 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor48%2023

Location

Douglas County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

91% Landfill gas · 152,119 MMBtu · reported9% Natural gas · 15,542 MMBtu · reported · $89,988 est.

Landfill gas supplies 91% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 3.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 60131.0BiogasOther Waste Biomass2001Operating
Unit 61011.0BiogasOther Waste Biomass1985Operating
Unit 61021.0BiogasOther Waste Biomass1985Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Omaha
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
SPP
NERC region
MRO
EIA plant ID
55033

Common questions

How big is Missouri River Wastewater Treatment?
3.0 MW across 3 generating units in service.
Who owns and operates it?
Operated by City of Omaha, filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1990. The oldest operating units are Unit 6101 and Unit 6102 (1985); the newest is Unit 6013 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Missouri River Wastewater Treatment. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $89,988 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Nebraska energyAll facilities in the state→Burwell3.3 MW operating capacity→ Mobile3.1 MW operating capacity→ Springview3.0 MW operating capacity→ Cuming County Renewables, LLC2.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming