New London County, Connecticut · ISO-NE · operated by Dominion Energy Nuclear Conn Inc
2023 · headline year
The largest power plant in Connecticut by capacity — 2,260 MW, first unit online in 1975, newest in 1986.
Capacity in service2,260MW2 units · nuclear
Rank in Connecticut#1of 168 · by capacity · #55 of 13,147 US
Location
Generating units
2 of 2 shown · 2,260 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
1,350.0
Nuclear
Nuclear
1986
Operating
Unit 2
909.9
Nuclear
Nuclear
1975
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; ownership stakes where a unit is jointly held.
Dominion Energy Nuclear Conn Inc 93% of 1 unit Green Mountain Power Corp 2% of 1 unit Massachusetts Mun Wholes Electric Co 5% of 1 unit
Entity type
Investor-Owned Utility
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
566
Common questions
How big is Millstone?
2,260 MW across 2 generating units in service.
Who owns and operates it?
Operated by Dominion Energy Nuclear Conn Inc, filed as investor-owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1982. The oldest operating unit is Unit 2 (1975); the newest is Unit 3 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Millstone. An absent date means none is currently filed, not that the plant will run indefinitely.