Milam Recycling and Disposal Facility

East Saint Louis, ST. Clair County, Illinois · MISO · operated by WM Illinois Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$1.29M2023 · estimate
Capacity in service2.4MW3 units · gas
Net generation19.3GWh2023 · reported
CO₂ emitted89,231t2023 · reported to EPA · 2,591st highest of 6,030 in the US
Rank in Illinois#224 (tied)of 433 · by capacity · #9,489 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor92%2023

Location

ST. Clair County · MISO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 210,592 MMBtu · reported · $1.22M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 2.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Natural GasNatural Gas Internal Combustion Engine1991Operating
Unit GEN20.8Natural GasNatural Gas Internal Combustion Engine1991Operating
Unit GEN30.8Natural GasNatural Gas Internal Combustion Engine1993Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Illinois Renewable Energy LLC
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1008269
Balancing authority
MISO
NERC region
SERC
EIA plant ID
50566

Common questions

How big is Milam Recycling and Disposal Facility?
2.4 MW across 3 generating units in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Illinois Renewable Energy LLC, filed as commercial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1992. The oldest operating units are Unit GEN1 and Unit GEN2 (1991); the newest is Unit GEN3 (1993).
When is it due to retire?
No retirement date has been filed for any operating unit at Milam Recycling and Disposal Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $1.29M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
89,231 t in 2023, reported to the EPA — the 2,591st highest of 6,030 US facilities that reported. Down from 135,813 t in 2011.

Related pages

Illinois energyAll facilities in the state→Com Adam 1WF-12.5 MW operating capacity→ KaneSolar03 LLC2.5 MW operating capacity→ Tazewell Recycling & Disposal Facility2.4 MW operating capacity→ 950th Sun 22.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming