Almanac › California › Midway Sunset
By place
Industrial + power · California
Midway Sunset
Fellows, Kern County, California · CAISO · operated by Chevron USA Inc
last reported to the EPA in 2015
2023 · headline year
Capacity in service 12.4MW 4 units · gas
Net generation 63.1GWh 2023 · reported
CO₂ emitted Not reported 2023 · last reported 2015
Rank in California #716 of 1,713 · by capacity · #5,124 (tied) of 13,147 US
Reported suppliers Not reported 2023
Capacity factor 58% 2023
Location Kern County · CAISO · WECC
What it burns 2023 · reported
Share of reported fuel consumption
100% Natural gas · 1.01 TBtu · reported
CO₂ emitted, t · 2011–15
0 200,000 400,000 600,000 2011 2013 2015
Reported (through 2015)
Generating units 4 of 4 shown · 12.4 MW in service
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Who supplies the fuel 2023
No fuel deliveries are reported for 2023.
Ownership & operations
Operating utility Chevron USA Inc
Entity type Industrial
Regulatory status Not Regulated
Industry sector Petroleum and Natural Gas Systems
EPA facility ID 1004193
Balancing authority CAISO
NERC region WECC
Gas pipeline Mojave Pipeline Co LLC
EIA plant ID 52085
Common questions
How big is Midway Sunset? 12.4 MW across 4 generating units in service.
Who owns and operates it? Operated by Chevron USA Inc, filed as industrial.
Which grid does it sell into? CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it? The capacity-weighted average megawatt here came online in 1982 . Every operating unit came online in 1982.
When is it due to retire? No retirement date has been filed for any operating unit at Midway Sunset. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from? In 2023 it burned natural gas.
Related pages
Select a state