AMERICAN ENERGY ATLAS
Power·Vermont

Middlebury College

Addison County, Vermont · ISO-NE · operated by Middlebury College Biomass

2023 · headline year
Fuel spend$622,6912023 · estimate
Capacity in service0.8MW1 unit · biomass · 1 more on standby or out of service
Net generation2.37GWh2023 · reported
Rank in Vermont#117 (tied)of 118 · by capacity · #13,121 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Addison County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

56% Biomass · 131,915 MMBtu · reported42% Natural gas · 99,681 MMBtu · reported · $547,249 est.1% Oil & petroleum · 3,150 MMBtu · reported · $75,442 est.

Biomass supplies 56% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 0.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 30.8WoodWood/Wood Waste Biomass1999Operating
Unit 20.6WoodWood/Wood Waste Biomass1985Out of service
Unit 10.2WoodWood/Wood Waste Biomass1980Retired 2011

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Middlebury College Biomass
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
57804

Common questions

How big is Middlebury College?
0.8 MW across 1 generating unit in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Middlebury College Biomass, filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1999.
When is it due to retire?
No retirement date has been filed for any operating unit at Middlebury College. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass, natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $622,691 in 2023 — natural gas $547,249 and oil & petroleum $75,442. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Vermont energyAll facilities in the state→Wrightsville Hydro Plant1.0 MW operating capacity→ Boltonville Hydro Associates0.8 MW operating capacity→ GLOBALFOUNDRIES U.S. 2 LLC - Vermont Facility142,165 t CO₂ in 2023→ Newsvt Landfill62,902 t CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming