AMERICAN ENERGY ATLAS
Power·Ohio

Miami Fort Generating Station

North Bend, Hamilton County, Ohio · PJM · operated by Luminant Miami Fort · owned by Vistra Corp

2023 · headline year
Fuel spend$86.5M2023 · estimate
Capacity in service1,181MW6 units · coal + oil
Net generation2.78TWh2023 · reported
CO₂ emitted2.86Mt2023 · reported to EPA · 180th highest of 6,030 in the US
Rank in Ohio#7of 189 · by capacity · #239 of 13,147 US
Reported suppliers82023 · 61 deliveries
Capacity factor27%2023

Location

Hamilton County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

99% Coal · 30.5 TBtu · reported · $81.9M est.1% Oil & petroleum · 0.217 TBtu · reported · $4.58M est.

Coal supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 1,181 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 8557.7Bituminous coalConventional Steam Coal1978Operating
Unit 7557.1Bituminous coalConventional Steam Coal1975Operating
Unit GT316.5Distillate oilPetroleum Liquids1971Operating
Unit GT416.5Distillate oilPetroleum Liquids1971Operating
Unit GT516.5Distillate oilPetroleum Liquids1971Operating
Unit GT616.5Distillate oilPetroleum Liquids1971Operating
Unit 6163.2Bituminous coalConventional Steam Coal1960Retired 2015
Unit 5100.0Bituminous coalConventional Steam Coal1949Retired 2008

All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit 7retirement2027-12557 MW
Unit 8retirement2027-12558 MW

Who supplies the fuel

1 of 8 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
American EnergyCoal16.5647,971Mcelroy Mine, West VirginiaRiver barge

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 8 suppliers. Subscribe to see all 8, every one of the 1,390 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 8 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Vistra Corp · 100%
Operating utility
Luminant Miami Fort
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000841
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
2832

Common questions

How big is Miami Fort Generating Station?
1,181 MW across 6 generating units in service — 1,115 MW of coal and 66.0 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Vistra Corp (100%) and operated by Luminant Miami Fort, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1976. The oldest operating units are Unit GT3, Unit GT4, Unit GT5 and Unit GT6 (1971); the newest is Unit 8 (1978).
When is it due to retire?
Planned retirement dates are filed for 2 of 6 operating units: Unit 7 (2027) and Unit 8 (2027).
What does it burn, and where does the fuel come from?
In 2023 it burned coal and oil & petroleum. Coal delivered in 2023 came from 7 coal suppliers, from mines in West Virginia, Illinois and Pennsylvania — principally Mcelroy Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $86.5M in 2023 — coal $81.9M and oil & petroleum $4.58M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2.86 Mt in 2023, reported to the EPA — the 180th highest of 6,030 US facilities that reported. Down from 6.97 Mt in 2011.

Related pages

Ohio energyAll facilities in the state→Perry1,312 MW operating capacity→ South Field Energy1,210 MW operating capacity→ Kyger Creek1,086 MW operating capacity→ Oregon Clean Energy Center1,062 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming