AMERICAN ENERGY ATLAS
Industrial + power·Florida

Mckay Bay Facility

Tampa, Hillsborough County, Florida · TEC · operated by City of Tampa · owned by City of Tampa Florida

2023 · headline year
Fuel spend$29,9722023 · estimate
Capacity in service22.1MW1 unit · waste
Net generation137GWh2023 · reported
CO₂ emitted126,881t2023 · reported to EPA · 2,051st highest of 6,030 in the US
Rank in Florida#238of 310 · by capacity · #4,324 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor71%2023

Location

Hillsborough County · TEC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 2.94 TBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 22.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN122.1Municipal solid wasteMunicipal Solid Waste1985Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Tampa Florida · 100%
Operating utility
City of Tampa
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004572
Balancing authority
TEC
NERC region
SERC
EIA plant ID
50875

Common questions

How big is Mckay Bay Facility?
22.1 MW across 1 generating unit in service.
Who owns and operates it?
Owned by City of Tampa Florida (100%) and operated by City of Tampa, filed as municipally owned utility.
Which grid does it sell into?
TEC (Tampa Electric Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1985.
When is it due to retire?
No retirement date has been filed for any operating unit at Mckay Bay Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $29,972 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
126,881 t in 2023, reported to the EPA — the 2,051st highest of 6,030 US facilities that reported. Up from 111,980 t in 2011.

Related pages

Florida energyAll facilities in the state→Field Street24.0 MW operating capacity→ English Creek Solar23.0 MW operating capacity→ Eight Flags Energy, LLC21.6 MW operating capacity→ CoTAL Solar Farm20.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming