AMERICAN ENERGY ATLAS
Power·California

McClure

Stanislaus County, California · BANC · operated by Modesto Irrigation District

2023 · headline year
Fuel spend$399,7452023 · estimate
Capacity in service142MW2 units · oil + gas
Net generation1.25GWh2023 · reported
Rank in California#182of 1,713 · by capacity · #1,952 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor0%2023

Location

Stanislaus County · BANC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

61% Natural gas · 17,719 MMBtu · reported · $147,504 est.39% Oil & petroleum · 11,309 MMBtu · reported · $252,241 est.

Natural gas supplies 61% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs McClure an estimated 2.7× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 142 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 171.2Distillate oilPetroleum Liquids1980Operating
Unit 271.2Natural GasNatural Gas Fired Combustion Turbine1981Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 84 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Modesto Irrigation District
Entity type
Political Subdivision
Regulatory status
Regulated
Balancing authority
BANC
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
151

Common questions

How big is McClure?
142 MW across 2 generating units in service — 71.2 MW of oil and 71.2 MW of natural gas.
Who owns and operates it?
Operated by Modesto Irrigation District, filed as political subdivision.
Which grid does it sell into?
BANC (Balancing Authority of Northern California) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. The oldest operating unit is Unit 1 (1980); the newest is Unit 2 (1981).
When is it due to retire?
No retirement date has been filed for any operating unit at McClure. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $399,745 in 2023 — natural gas $147,504 and oil & petroleum $252,241. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Tule Wind LLC143 MW operating capacity→ Poe143 MW operating capacity→ Pit 5142 MW operating capacity→ Panoche Valley Solar Farm140 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming