AMERICAN ENERGY ATLAS
Power·North Carolina

Mayo Electric Generating Plant

Roxboro, Person County, North Carolina · CPLE · operated by Duke Energy Progress - (NC) · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$55.1M2023 · reported deliveries
Capacity in service763MW1 unit · coal
Net generation1.22TWh2023 · reported
CO₂ emitted1.37Mt2023 · reported to EPA · 443rd highest of 6,030 in the US
Rank in North Carolina#14of 908 · by capacity · #431 of 13,147 US
Reported suppliers62023 · 29 deliveries
Capacity factor18%2023

Location

Person County · CPLE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

98% Coal · 12.6 TBtu · reported2% Oil & petroleum · 0.192 TBtu · reported

Coal supplies 98% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 763 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1763.2Bituminous coalConventional Steam Coal1983Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 6 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
ConsolCoal4.45171,268Bailey Mine, PennsylvaniaRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 6 suppliers. Subscribe to see all 6, every one of the 379 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 6 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Progress - (NC)
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001049
Balancing authority
CPLE
NERC region
SERC
EIA plant ID
6250

Common questions

How big is Mayo Electric Generating Plant?
763 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Progress - (NC), filed as investor-owned utility.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1983.
When is it due to retire?
No retirement date has been filed for any operating unit at Mayo Electric Generating Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and oil & petroleum. Coal delivered in 2023 came from 6 coal suppliers, from mines in West Virginia and Pennsylvania — principally Bailey Mine.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $55.1M in 2023.
How much CO₂ does it emit?
1.37 Mt in 2023, reported to the EPA — the 443rd highest of 6,030 US facilities that reported. Down from 3.59 Mt in 2011.

Related pages

North Carolina energyAll facilities in the state→Harris951 MW operating capacity→ L V Sutton Steam Electric Plant851 MW operating capacity→ Cleveland County Generating Facility736 MW operating capacity→ Buck698 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming