Fulton County, Georgia · SOCO · operated by Cube District Energy, LLC

2023 · headline year
Fuel spend$2.25M2023 · estimate
Capacity in service6.6MW3 units · gas
Net generation41.5GWh2023 · reported
Rank in Georgia#141 (tied)of 247 · by capacity · #6,214 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor72%2023

Location

Fulton County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

98% Natural gas · 430,813 MMBtu · reported · $2.25M est.2% Landfill gas · 9,585 MMBtu · reported

Natural gas supplies 98% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2013–2023

0200,000400,000600,000201320182023
Reported (through 2023)

Generating units

3 of 3 shown · 6.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 12.2Natural GasNatural Gas Internal Combustion Engine2012Operating
Unit 22.2Natural GasNatural Gas Internal Combustion Engine2012Operating
Unit 32.2Natural GasNatural Gas Internal Combustion Engine2012Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Cube District Energy, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
SOCO
NERC region
SERC
Gas pipeline
Southern Natural Gas Company
EIA plant ID
58484

Common questions

How big is MAS ASB Cogen Plant?
6.6 MW across 3 generating units in service.
Who owns and operates it?
Operated by Cube District Energy, LLC, filed as independent power producer.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012. Every operating unit came online in 2012.
When is it due to retire?
No retirement date has been filed for any operating unit at MAS ASB Cogen Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and landfill gas.
How much does it spend on fuel?
An estimated $2.25M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Georgia energyAll facilities in the state→Georgia LFG Oak Grove Plant6.6 MW operating capacity→ Georgia LFG Pine Ridge Plant6.6 MW operating capacity→ Dalton 26.5 MW operating capacity→ Superior Landfill & Recycling Center6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming