Natural gas supplies 99% of the fuel energy it burned in 2023.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
10 of 10 shown · 1,701 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
850.5
Natural Gas
Natural Gas Steam Turbine
1975
Operating
Unit 4
850.5
Natural Gas
Natural Gas Steam Turbine
1977
Operating
Unit 1
156.2
Bituminous coal
Conventional Steam Coal
1954
Retired 2007
Unit 2
156.2
Bituminous coal
Conventional Steam Coal
1956
Retired 2007
Unit CTG1
23.6
Natural Gas
Natural Gas Fired Combustion Turbine
1971
Retired 2023
Unit CTG2
23.6
Natural Gas
Natural Gas Fired Combustion Turbine
1971
Retired 2023
Unit CTG4
23.6
Natural Gas
Natural Gas Fired Combustion Turbine
1971
Retired 2023
Unit CTG3
22.3
Natural Gas
Natural Gas Fired Combustion Turbine
1971
Retired 2022
Unit MCD1
2.7
Distillate oil
Petroleum Liquids
1967
Retired 2007
Unit MCD2
2.7
Distillate oil
Petroleum Liquids
1967
Retired 2007
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 175 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Texas Eastern Transmission LP, Transcontinental Gas Pipeline
EIA plant ID
3148
Common questions
How big is Martins Creek?
1,701 MW across 2 generating units in service. A further 8 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Talen Energy Corp (100%) and operated by TalenEnergy Martins Creek LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1976. The oldest operating unit is Unit 3 (1975); the newest is Unit 4 (1977).
When is it due to retire?
No retirement date has been filed for any operating unit at Martins Creek. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $22.4M in 2023 — natural gas $21.7M and oil & petroleum $682,614. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
384,286 t in 2023, reported to the EPA — the 1,088th highest of 6,030 US facilities that reported. Down from 467,704 t in 2011.