AMERICAN ENERGY ATLAS
Industrial + power·Ohio

Mahoning Landfill

New Springfield, Mahoning County, Ohio · PJM · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Capacity in service4.0MW5 units · biomass
Net generation28.9GWh2023 · reported
CO₂ emitted57,131t2023 · reported to EPA · 3,437th highest of 6,030 in the US
Rank in Ohio#127 (tied)of 189 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor82%2023

Location

Mahoning County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 340,663 MMBtu · reported

CO₂ emitted, t · 2013–2023

025,00050,00075,000201320182023
Reported (through 2023)

Generating units

6 of 6 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Landfill gasLandfill Gas2013Operating
Unit GEN20.8Landfill gasLandfill Gas2013Operating
Unit GEN30.8Landfill gasLandfill Gas2013Operating
Unit GEN40.8Landfill gasLandfill Gas2013Operating
Unit GEN50.8Landfill gasLandfill Gas2013Operating
Unit GEN60.8Landfill gasLandfill Gasnot reportedCanceled

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007756
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
57411

Common questions

How big is Mahoning Landfill?
4.0 MW across 5 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Mahoning Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much CO₂ does it emit?
57,131 t in 2023, reported to the EPA — the 3,437th highest of 6,030 US facilities that reported. Up from 52,751 t in 2013.

Related pages

Ohio energyAll facilities in the state→Zephyr Wind Project - 2.04.5 MW operating capacity→ Igs CMH4, LLC4.2 MW operating capacity→ Geneva Landfill4.0 MW operating capacity→ Celina Solar Project #1, LLC4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming