Hinkley, San Bernardino County, California · CAISO · operated by Terra-Gen Operating Co-Solar · owned by Terra-Gen Power LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit LOC1 | 100.4 | Solar | Solar Photovoltaic | 2023 | Operating |
| Unit LHC1 | 69.0 | Storage | Batteries | 2025 | Proposed |
| Unit GEN1 · plant 10444 | 92.0 | Solar | Solar Thermal without Energy Storage | 1989 | Retired 2021 |
| Unit GEN1 · plant 10446 | 92.0 | Natural Gas | Natural Gas Steam Turbine | 1990 | Retired 2024 |
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; panel technology, tracking and DC capacity.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit LHC1 | new unit | 2025 | 69.0 MW |
Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.
See the delivery history →