Power·Florida
Long Branch Solar
Manatee County, Florida · TEC · operated by Tampa Electric Co
Capacity shown is planned or not in service
Proposed
A planned 74.5 MW solar photovoltaic project, filed to come online in 2025.
Planned capacity74.5MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Tampa Electric Co
- Entity type
- Investor-Owned Utility
- Regulatory status
- Regulated
- Balancing authority
- TEC
- NERC region
- SERC
- EIA plant ID
- 68472
Common questions
How big is Long Branch Solar?
74.5 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Tampa Electric Co, filed as investor-owned utility.
Which grid does it sell into?
TEC (Tampa Electric Company) is its balancing authority, inside NERC's SERC region.
What does it run on?
Solar Photovoltaic (74.5 MW).
Related pages
Select a state