AMERICAN ENERGY ATLAS
Power·California

Lockhart Solar PV II

San Bernardino County, California · CAISO · operated by Terra-Gen Operating Co-Solar

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service84.4MW1 unit · solar
Rank in California#283of 1,713 · by capacity · #2,662 (tied) of 13,147 US

Location

San Bernardino County · CAISO · WECC

Generating units

2 of 2 shown · 84.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit LOC284.4SolarSolar Photovoltaic2023Operating
Unit LHC259.7StorageBatteries2025Proposed

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →
UnitEventWhenMW
Unit LHC2new unit202559.7 MW

Ownership & operations

Operating utility
Terra-Gen Operating Co-Solar
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
66699

Common questions

How big is Lockhart Solar PV II?
84.4 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Terra-Gen Operating Co-Solar, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Lockhart Solar PV II. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (84.4 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→Valley Center 8585.0 MW operating capacity→ Edwards Sanborn S184.6 MW operating capacity→ Estrella Solar & Storage84.0 MW operating capacity→ AES ES Alamitos 2 LLC82.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming