Sangamon County, Illinois · MISO · operated by Lincoln Land Energy Center LLC
Capacity shown is planned or not in service
Proposed
A planned 1,277 MW natural gas fired combined cycle project, filed to come online in 2027.
Planned capacity1,277MW2 units · not yet in service
Reported suppliersNot reported2023
Location
Generating units
2 of 2 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
638.4
Natural Gas
Natural Gas Fired Combined Cycle
2027
Proposed
Unit GEN2
638.4
Natural Gas
Natural Gas Fired Combined Cycle
2028
Proposed
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.