Harris County, Texas · ERCOT · operated by Liberty 1 Solar LLC
Capacity shown is planned or not in service
A planned 132 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit LIB1 | 67.2 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit LIB2 | 65.0 | Storage | Batteries | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit LIB1 | new unit | 2025 | 67.2 MW |
| Unit LIB2 | new unit | 2025 | 65.0 MW |