Laredo, Webb County, Texas · ERCOT · operated by City of San Antonio - (TX) · owned by Talen Energy Corp
2023 · headline year
Fuel spend$1.11M2023 · estimate
Capacity in service264MW2 units · gas
Net generation42.1GWh2023 · reported
CO₂ emitted21,869t2023 · reported to EPA · 5,350th highest of 6,030 in the US
Rank in Texas#177of 941 · by capacity · #1,131 of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor2%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 409,311 MMBtu · reported · $1.11M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 264 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 4
131.8
Natural Gas
Natural Gas Fired Combustion Turbine
2008
Operating
Unit 5
131.8
Natural Gas
Natural Gas Fired Combustion Turbine
2008
Operating
Unit 3
115.2
Natural Gas
Natural Gas Steam Turbine
1975
Retired 2008
Unit 2
37.5
Natural Gas
Natural Gas Steam Turbine
1955
Retired 2008
Unit 1
34.5
Natural Gas
Natural Gas Steam Turbine
1951
Retired 2008
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
264 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Talen Energy Corp (100%) and operated by City of San Antonio - (TX), filed as municipally owned utility.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. Every operating unit came online in 2008.
When is it due to retire?
No retirement date has been filed for any operating unit at Laredo. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $1.11M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
21,869 t in 2023, reported to the EPA — the 5,350th highest of 6,030 US facilities that reported. Down from 54,563 t in 2011.