AMERICAN ENERGY ATLAS
Power·Iowa

Lamoni Municipal Utilities

Decatur County, Iowa · MISO · operated by City of Lamoni - (IA)

2023 · headline year
Fuel spend$31,3042023 · estimate
Capacity in service10.5MW8 units · oil
Net generation135MWh2023 · reported
Rank in Iowa#142 (tied)of 256 · by capacity · #5,320 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Decatur County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 1,464 MMBtu · reported · $31,304 est.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 10.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 12.8Distillate oilPetroleum Liquids1973Operating
Unit 72.5Distillate oilPetroleum Liquids2011Operating
Unit 82.5Distillate oilPetroleum Liquids2011Operating
Unit 51.1Distillate oilPetroleum Liquids1955Operating
Unit 40.6Distillate oilPetroleum Liquids1948Operating
Unit 60.5Distillate oilPetroleum Liquids1993Operating
Unit 30.3Distillate oilPetroleum Liquids1941Operating
Unit 20.2Distillate oilPetroleum Liquids1940Operating

All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Lamoni - (IA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
1155

Common questions

How big is Lamoni Municipal Utilities?
10.5 MW across 8 generating units in service.
Who owns and operates it?
Operated by City of Lamoni - (IA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. The oldest operating unit is Unit 2 (1940); the newest are Unit 7 and Unit 8 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at Lamoni Municipal Utilities. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $31,304 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Iowa energyAll facilities in the state→Iowa Lakes Superior Wind Farm10.5 MW operating capacity→ Lakota Wind Wind Farm10.5 MW operating capacity→ Atlantic10.0 MW operating capacity→ Tipton9.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming