AMERICAN ENERGY ATLAS
Power·Indiana

Lake Trout Solar

Blackford County, Indiana · PJM · operated by Lake Trout Solar

Capacity shown is planned or not in service

Proposed

A planned 245 MW solar photovoltaic project, filed to come online in 2027.

Planned capacity245MW1 unit · not yet in service

Location

Blackford County · PJM · RFC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit LAKET245.0SolarSolar Photovoltaic2027Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit LAKETnew unit2027245 MW

Ownership & operations

Operating utility
Lake Trout Solar
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
68302

Common questions

How big is Lake Trout Solar?
245 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Lake Trout Solar, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
What does it run on?
Solar Photovoltaic (245 MW).

Related pages

Indiana energyAll facilities in the state→International Mill Service, Inc.Industrial facility→ Jasper Municipal Electric UtilityPower facility→ Lilly Technical CenterPower facility→ Logansport Municipal Utilities Electric Generating PlantPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming