AMERICAN ENERGY ATLAS
Industrial + power·Illinois

Lake Landfill

Northbrook, Cook County, Illinois · PJM · operated by WM Illinois Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Capacity in service6.0MW2 units · biomass
Net generation11.8GWh2023 · reported
CO₂ emitted6,685t2023 · reported to EPA · 5,853rd highest of 6,030 in the US
Rank in Illinois#161 (tied)of 433 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor22%2023

Location

Cook County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 250,435 MMBtu · reported

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN23.0Landfill gasLandfill Gas1993Operating
Unit GEN33.0Landfill gasLandfill Gas1993Operating
Unit GEN13.0Landfill gasLandfill Gas1988Retired 2008

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Illinois Renewable Energy LLC
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1003588
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50575

Common questions

How big is Lake Landfill?
6.0 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Illinois Renewable Energy LLC, filed as commercial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. Every operating unit came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at Lake Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much CO₂ does it emit?
6,685 t in 2023, reported to the EPA — the 5,853rd highest of 6,030 US facilities that reported. Down from 77,653 t in 2011.

Related pages

Illinois energyAll facilities in the state→Argonne National Laboratory CHP6.3 MW operating capacity→ Settlers Hill Rdf/midway Landfill6.0 MW operating capacity→ Charter Dura-Bar6.0 MW operating capacity→ City of Peru Rail Generating Station5.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming