Tempe, Maricopa County, Arizona · SRP · operated by Salt River Project · owned by Salt River Project Agricultural Improvement & Power District
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit KY7 | 170.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2002 | Operating |
| Unit KY7A | 122.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2002 | Operating |
| Unit KY2 | 73.5 | Natural Gas | Natural Gas Steam Turbine | 1954 | Out of service |
| Unit KY5 | 60.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 1973 | Operating |
| Unit KY6 | 60.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 1973 | Operating |
| Unit KY4 | 53.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 1971 | Operating |
| Unit KY1 | 34.5 | Natural Gas | Natural Gas Steam Turbine | 1952 | Out of service |
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit KY7 | uprate | 2025-06 | 17.0 MW |
| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Kinder Morgan | Natural gas | 9.37 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 152 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →