Imperial County, California · CAISO · operated by 90FI 8me, LLC
Capacity shown is planned or not in service
A planned 299 MW solar photovoltaic project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 90FI8 | 225.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
| Unit 90FIB | 74.0 | Storage | Batteries | 2027 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 90FI8 | new unit | 2027 | 225 MW |
| Unit 90FIB | new unit | 2027 | 74.0 MW |