AMERICAN ENERGY ATLAS
Industrial + power·California

Kiefer Landfill

Sloughhouse, Sacramento County, California · BANC · operated by Sacramento County of Dpt Waste · owned by County of Sacramento

2023 · headline year
Capacity in service15.2MW5 units · biomass
Net generation66.6GWh2023 · reported
CO₂ emitted194,631t2023 · reported to EPA · 1,550th highest of 6,030 in the US
Rank in California#685of 1,713 · by capacity · #4,907 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor50%2023

Location

Sacramento County · BANC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 851,956 MMBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 15.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit UNIT43.1Landfill gasLandfill Gas2012Operating
Unit UNIT53.1Landfill gasLandfill Gas2012Operating
Unit 361A3.0Landfill gasLandfill Gas1999Operating
Unit 361B3.0Landfill gasLandfill Gas1999Operating
Unit 361C3.0Landfill gasLandfill Gas1999Operating

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
County of Sacramento · 100%
Operating utility
Sacramento County of Dpt Waste
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004037
Balancing authority
BANC
NERC region
WECC
EIA plant ID
55766

Common questions

How big is Kiefer Landfill?
15.2 MW across 5 generating units in service.
Who owns and operates it?
Owned by County of Sacramento (100%) and operated by Sacramento County of Dpt Waste, filed as municipally owned utility.
Which grid does it sell into?
BANC (Balancing Authority of Northern California) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. The oldest operating units are Unit 361A, Unit 361B and Unit 361C (1999); the newest are Unit UNIT4 and Unit UNIT5 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Kiefer Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much CO₂ does it emit?
194,631 t in 2023, reported to the EPA — the 1,550th highest of 6,030 US facilities that reported. Down from 249,959 t in 2011.

Related pages

California energyAll facilities in the state→EDF Renewable Windfarm V Inc15.5 MW operating capacity→ French Meadows15.3 MW operating capacity→ San Diego State University15.1 MW operating capacity→ Antelope Expansion 3A15.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming