AMERICAN ENERGY ATLAS
Power·Missouri

Kahoka

Clark County, Missouri · MISO · operated by City of Kahoka

2023 · headline year
Fuel spend$9,6632023 · estimate
Capacity in service4.2MW5 units · oil · 3 more on standby or out of service
Net generation17MWh2023 · reported
Rank in Missouri#96of 119 · by capacity · #7,980 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Clark County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 438 MMBtu · reported · $9,663 est.

Reported fuel consumption, MMBtu · 2011–2023

0200400600201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 4.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 81.5Natural GasNatural Gas Internal Combustion Engine1969Standby
Unit 101.1Distillate oilPetroleum Liquids1999Operating
Unit 111.1Distillate oilPetroleum Liquids1999Operating
Unit 121.1Distillate oilPetroleum Liquids1999Operating
Unit 90.9Natural GasNatural Gas Internal Combustion Engine1982Standby
Unit 70.8Natural GasNatural Gas Internal Combustion Engine1956Standby
Unit 60.7Distillate oilPetroleum Liquids1952Operating
Unit 30.2Distillate oilPetroleum Liquids1941Operating

All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Kahoka
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
2138

Common questions

How big is Kahoka?
4.2 MW across 5 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Kahoka, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1988. The oldest operating unit is Unit 3 (1941); the newest are Unit 10, Unit 11 and Unit 12 (1999).
When is it due to retire?
No retirement date has been filed for any operating unit at Kahoka. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $9,663 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Missouri energyAll facilities in the state→Shelbina Power #14.6 MW operating capacity→ O'Fallon Renewable Energy Center4.5 MW operating capacity→ Black Oak Power Producers4.0 MW operating capacity→ La Plata3.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming