Jones County, Texas · ERCOT · operated by Lightsource Renewable Energy Asset Management, LLC
Capacity shown is planned or not in service
A planned 385 MW batteries project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit TXJS2 | 200.0 | Storage | Batteries | 2027 | Proposed |
| Unit TXJC2 | 185.0 | Solar | Solar Photovoltaic | 2026 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit TXJC2 | new unit | 2026 | 185 MW |
| Unit TXJS2 | new unit | 2027 | 200 MW |