AMERICAN ENERGY ATLAS
Power·Rhode Island

Johnston LFG Turbine Plant

Providence County, Rhode Island · ISO-NE · operated by Rhode Island LFG Genco

2023 · headline year
Capacity in service35.7MW5 units · biomass
Net generation231GWh2023 · reported
Rank in Rhode Island#8of 105 · by capacity · #3,888 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor74%2023

Location

Providence County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 2.29 TBtu · reported

Reported fuel consumption, TBtu · 2013–2023

0123201320182023
Reported (through 2023)

Generating units

5 of 5 shown · 35.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GENS110.5Landfill gasLandfill Gas2013Operating
Unit GENT16.3Landfill gasLandfill Gas2013Operating
Unit GENT26.3Landfill gasLandfill Gas2013Operating
Unit GENT36.3Landfill gasLandfill Gas2013Operating
Unit GENT46.3Landfill gasLandfill Gas2013Operating

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Rhode Island LFG Genco
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
59254

Common questions

How big is Johnston LFG Turbine Plant?
35.7 MW across 5 generating units in service.
Who owns and operates it?
Operated by Rhode Island LFG Genco, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Johnston LFG Turbine Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Rhode Island energyAll facilities in the state→Robin Hollow Solar40.7 MW operating capacity→ Dry Bridge Solar (Brown University)40.0 MW operating capacity→ Block Island Wind Farm30.0 MW operating capacity→ University Solar, LLC24.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming