Providence County, Rhode Island · ISO-NE · operated by Rhode Island LFG Genco
2023 · headline year
Capacity in service35.7MW5 units · biomass
Net generation231GWh2023 · reported
Rank in Rhode Island#8of 105 · by capacity · #3,888 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor74%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Landfill gas · 2.29 TBtu · reported
Reported fuel consumption, TBtu · 2013–2023
Reported (through 2023)
Generating units
5 of 5 shown · 35.7 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GENS1
10.5
Landfill gas
Landfill Gas
2013
Operating
Unit GENT1
6.3
Landfill gas
Landfill Gas
2013
Operating
Unit GENT2
6.3
Landfill gas
Landfill Gas
2013
Operating
Unit GENT3
6.3
Landfill gas
Landfill Gas
2013
Operating
Unit GENT4
6.3
Landfill gas
Landfill Gas
2013
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Rhode Island LFG Genco, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Johnston LFG Turbine Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?