ST. Marys, Pottawatomie County, Kansas · SPP · operated by Evergy Kansas Central, Inc · owned by Evergy Inc
2023 · headline year
The largest power plant in Kansas by capacity — 2,160 MW, 100% coal by fuel energy in 2023, first unit online in 1978, newest in 1983.
Fuel spend$113M2023 · estimate
Capacity in service2,160MW3 units · coal
Net generation5.85TWh2023 · reported
CO₂ emitted6.12Mt2023 · reported to EPA · 44th highest of 6,030 in the US
Rank in Kansas#1of 173 · by capacity · #60 (tied) of 13,147 US
Reported suppliers42023 · 70 deliveries
Capacity factor31%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 66.5 TBtu · reported · $111M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 2,160 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
720.0
Subbituminous
Conventional Steam Coal
1978
Operating
Unit 2
720.0
Subbituminous
Conventional Steam Coal
1980
Operating
Unit 3
720.0
Subbituminous
Conventional Steam Coal
1983
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 365 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Evergy Kansas Central, Inc 72% of 3 units Evergy Kansas South, Inc 20% of 3 units Evergy Missouri West 8% of 3 units
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000581
Balancing authority
SPP
NERC region
MRO
EIA plant ID
6068
Common questions
How big is Jeffrey Energy Center?
2,160 MW across 3 generating units in service.
Who owns and operates it?
Owned by Evergy Inc and operated by Evergy Kansas Central, Inc, filed as investor-owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1980. The oldest operating unit is Unit 1 (1978); the newest is Unit 3 (1983).
When is it due to retire?
No retirement date has been filed for any operating unit at Jeffrey Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 3 coal suppliers, from mines in Wyoming — principally Cordero Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $113M in 2023 — coal $111M and oil & petroleum $2.15M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
6.12 Mt in 2023, reported to the EPA — the 44th highest of 6,030 US facilities that reported. Down from 14.8 Mt in 2011.