Hardeeville, Jasper County, South Carolina · SCEG · operated by Dominion Energy South Carolina, Inc · owned by Dominion Energy Inc
2023 · headline year
Reported fuel cost$142M2023 · reported deliveries
Capacity in service1,068MW4 units · gas
Net generation5.32TWh2023 · reported
CO₂ emitted2.05Mt2023 · reported to EPA · 297th highest of 6,030 in the US
Rank in South Carolina#8of 204 · by capacity · #286 of 13,147 US
Reported suppliers212023 · 143 deliveries
Capacity factor57%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 38.7 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 1,068 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST1
443.7
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CT1
212.8
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CT3
212.8
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CT2
198.9
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 21 suppliers. Subscribe to see all 21, every one of the 1,481 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Dominion Energy Inc (100%) and operated by Dominion Energy South Carolina, Inc, filed as investor-owned utility.
Which grid does it sell into?
SCEG (Dominion Energy South Carolina) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. Every operating unit came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Jasper County Generating Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 21 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $142M in 2023.
How much CO₂ does it emit?
2.05 Mt in 2023, reported to the EPA — the 297th highest of 6,030 US facilities that reported. Up from 1.96 Mt in 2011.